How does a website prove that it is hosted with green electricity?
“This website runs on green electricity” is often at the foot of a page. The examination checks whether this is proven: It asks the Green Web Foundation, an open database of hosters with green energy proof. If your hoster is not there and does not name the site an eco-label for data centers, reports the "green energy statement without public proof".
For an indication of electricity, the prohibition of misleading applies
“Hosted with green electricity” is a specific environmental statement: it mentions a feature, the power of the data center. They shall be prohibited from making misleading claims. According to § 5 Abs. 2 UWG in Germany is a misleading act if it contains untrue information, and since the amendment no. 1 expressly mentions the ecological characteristics of a good or service; in Austria, the rule is in § 2 UWG. Recital 11 of Directive (EU) 2024/825 describes a case close to hosting: One company gives the impression that it uses only energy from renewable sources, although many of its plants continue to run on fossil fuels. This is a statement about the whole thing, which concerns only a part, and it is number 4b on the list of commercial practices which are considered unfair in all circumstances.
Data center power is part of the bill
According to version 3 of the Sustainable Web Design Model, which is expected in the audit, 15% of the energy of a page view is generated by data centers, 14% by the network, 52% by visitors' devices and 19% by hardware production. Green electricity at the hoster therefore affects the share that your hoster controls. A sentence like “This website is in a data center with green electricity” says exactly that. “Our website is climate neutral because we use green electricity” says more than the electricity of the hoster: the network and devices of the visitors continue to run with the general electricity mix.
An eco-label for data centers verifies more than electricity
The entry at the Green Web Foundation proves the power supply. An eco-label for data centers continues. The Austrian Ecolabel UZ 80 requires that the data center covers 100 % of its electricity needs from renewable energies such as hydropower, photovoltaics, wind power or biomass, and takes as proof, for example, the electricity supply contract, a power purchase agreement or the certificate of origin from the register of the Federal Environment Agency. It is based on the award basis DE-UZ 228 of the Blue Angel. There, an independent auditor on behalf of the German Federal Environment Agency examines minimum requirements, including the energy efficiency of building technology and information technology and reporting, with which customers can operate their own technology more economically. Whoever calls such a sign occupies with a set of electricity and operation.
What the Green Web Foundation shows
The Green Web Foundation maintains an open database of hosters who have proven their electricity supply from renewable sources. The check asks for the host of your website whether it is listed as green there. The database responds with “green” or “no entry”. Without entry, the statement is not publicly proven: The examination then reports "green energy statement without public proof", a note that costs five points for the environmental statements. If the database explicitly runs a hoster without proof, it contradicts the statement, and this costs twenty points.
What else counts as proof
Ecolabels for data centres also back the claim: the Austrian Ecolabel UZ 80, the Blue Angel DE-UZ 228 for data centres, or DE-UZ 161. If such a label stands in the same sentence as the hosting claim, the check reports nothing. The host’s electricity supply contract or a guarantee of origin also proves the green electricity; once it is filed with the Green Web Foundation, it counts from the next run.
Examples
Note in the footer
Diese Website wird mit Ökostrom gehostet.Diese Website liegt in einem Rechenzentrum mit dem Österreichischen Umweltzeichen UZ 80.- Ask your host for proof of its electricity supply: electricity supply contract, guarantee of origin or the data centre’s ecolabel.
- Ask it to file the proof with the Green Web Foundation; the entry is free and applies to all its customers.
- On your website, name the ecolabel or the proof in the same sentence as the hosting claim, or adjust the claim to the actual electricity supply.
- Let the hoster tell you for which location the proof applies. A provider with multiple data centers can purchase green electricity in one and run your server in another.
- If your website is behind a CDN, its servers answer many views. Also ask there about the electricity purchase before you write that the website is delivered with green electricity.
- Does your website still show the sign DE-UZ 161: The Blue Angel has combined the characters DE-UZ 161 and DE-UZ 214 to form the character DE-UZ 228 for data centers. Ask the hoster for the sign that applies to their data center today.
- When you enter the Green Web Foundation, state the date of the query. An entry can change, and the date shows which status is meant.